After fighting with the electrical for more than 8 weeks I can finally get engines around the entire layout! PTL! As basically a lone wolf during construction, it was brutal hopping between under the layout and above the layout to test continuity.
After re-positioning the order of the modules, I had to switch the common side on 2 of the 4 "legs" to mate the 2 operational (and electrical) towers to "play nice". (This is a DC layout utilizing a "common rail".)
All the track is now in place but there are multiple physical locations that need significant "tuning" work. (Not to mention the 63 turnouts.) And the summer heat in the loft has not done us any favors.
I am currently returning buildings to the layout and working on scenery repair. I am also installing some plexiglass shields to cover some details that are now exposed to damage from family members coming upstairs to use the computer.
Wow, long road! Fourteen months since I "foolishly" decided to improve operations! At least there is light at the end of the tunnel. Operations in the fall? 😀
Thursday, June 20, 2019
Sunday, June 2, 2019
PIOMIP Continued
All the track is now in and you would think I would be able to run again.
Wrong! Somewhere along the line I have screwed up the electrical (happens when you connect different sections together in different orders: A to B to C to A became A-C-B-D-A).
I think I even blew a power pack.
I'll have to wait until I can get a second electrically minded person on site to begin testing and analyzing connections.
Electrical: 2 steps forward and 3 steps backward.
Layout progress overview:
Adding roads (1st pass):
Timber Creek:
Making Westville and Woodbury (see above) legs a peninsula costs about 18" of straight-away.
Wrong! Somewhere along the line I have screwed up the electrical (happens when you connect different sections together in different orders: A to B to C to A became A-C-B-D-A).
I think I even blew a power pack.
I'll have to wait until I can get a second electrically minded person on site to begin testing and analyzing connections.
Electrical: 2 steps forward and 3 steps backward.
Layout progress overview:
![]() |
| Woodbury on left; Glassboro/Thorofare Junction ahead; new staging yards on right |
| Loop to gain altitude |
![]() |
| Woodbury realignment due to peninsula |
![]() |
| Buzby Bros. Cement spur relocated; PRSL power plant spur extended; Brooklawn circle added |
![]() |
| North Woodbury - Holloway Lumber spur modified |
Saturday, May 18, 2019
First Coat Plus Some Paint
Sunday, May 5, 2019
Track Cleaning
I know it's a tired old argument with everybody having their favorite method but the (free) Model Railroad Hobbyist on-line magazine contained an article (under "Publisher's Musings") that dealt with the topic and gave a scientific explanation for the dirty track we all fight with.
They also rated 34 products on their effectiveness in controlling the cause of dirty track. Here are the results.
I am sure the "my favorite product" arguments will never fully go away but I hope this at least minimizes their frequency.
I have used Wahl's Clipper Oil for about 20 years, over multiple layouts, and can vouch that I can go without cleaning track (during non-construction periods) for more than 5 years at a time. (The exception being my 63 sets of switch points).
They also rated 34 products on their effectiveness in controlling the cause of dirty track. Here are the results.
I am sure the "my favorite product" arguments will never fully go away but I hope this at least minimizes their frequency.
I have used Wahl's Clipper Oil for about 20 years, over multiple layouts, and can vouch that I can go without cleaning track (during non-construction periods) for more than 5 years at a time. (The exception being my 63 sets of switch points).
Thursday, May 2, 2019
Soaring Possibilities
There are two "periods" when I am thrilled feeling the artistic "soaring possibilities" in model railroading construction:
1) When you first lay track on a wooden benchwork (I get delirious at the smell of freshly cut and recently drilled wood). You can envision the beautiful possibilities laying just down the road and around the construction bend.
2) After you have covered the cardboard webbing of the first scenery mock-ups.
Final scenery, although satisfying, never quite measures up to the unlimited possibilities immediately after the above steps.
Anyway after coming down from my Pepsi high, I should get to see this week if my Sculptamold stash is still usable and get in the first pass ground covering. Wish me luck!
1) When you first lay track on a wooden benchwork (I get delirious at the smell of freshly cut and recently drilled wood). You can envision the beautiful possibilities laying just down the road and around the construction bend.
2) After you have covered the cardboard webbing of the first scenery mock-ups.
Final scenery, although satisfying, never quite measures up to the unlimited possibilities immediately after the above steps.
Anyway after coming down from my Pepsi high, I should get to see this week if my Sculptamold stash is still usable and get in the first pass ground covering. Wish me luck!
![]() |
| I still have to decide whether to permanently cover 2/3 of the access hatch. |
| Glassboro Junction |
| Woodbury to Glassboro |
![]() |
| The last 3' of track to complete the mainline. Bridge will go in after the Sculptamold. |
Monday, April 29, 2019
Atlantic County 4H Train Meet
I got to visit the Atlantic County 4H Train Meet on Saturday April 29th. We went to the back door by mistake and immediately ran into 3 folks I was acquainted with from the Railwire forum, It was great to see the faces of people I had only known via the internet.
They were there selling off David K Smith's vast stock of old N gauge equipment and buildings at fantastic prices. If I hadn't been chatting with them I would have gotten a Minitrix K4 for $15 but a few people ahead of me bought them in multiple quantities and wiped out the stock before I had a chance.
I had hoped to get to meet DKS so I could personally thank him for doing a track plan illustration for an N Scale Magazine article I published years ago but alas he was not in attendance. I did get to see some of his handiwork. Cody now has possession of his Trenton Transportation Company masterpiece:
This is a sight you do not usually get to see: a freight train volcanic disaster:
A few additional photos:
![]() |
| Cody, Chris, and Ed |
I had hoped to get to meet DKS so I could personally thank him for doing a track plan illustration for an N Scale Magazine article I published years ago but alas he was not in attendance. I did get to see some of his handiwork. Cody now has possession of his Trenton Transportation Company masterpiece:
![]() |
| DKS' Trenton Transportation Company layout |
A few additional photos:
Saturday, March 9, 2019
Slow Crawl
As usual my modeling work during the tax prep season (38 days to go!) comes to a very slow crawl.
I have managed to complete and wire the staging yards, add a shelf over the staging yard with under-shelf LED lighting, complete the Glassboro junction trackwork and loop, and start the Brooklawn bridges. The bridges are in the last section necessary to restore the layout to running order.
I have managed to complete and wire the staging yards, add a shelf over the staging yard with under-shelf LED lighting, complete the Glassboro junction trackwork and loop, and start the Brooklawn bridges. The bridges are in the last section necessary to restore the layout to running order.
![]() |
| Lionel TT gauge (1:120) display models |
![]() |
| Glassboro Loop |
![]() |
| Glassboro Junction |
![]() |
| Brooklawn Bridges |
I have begun returning buildings to the layout and testing arrangements.
A scenic divider was adding to separate Westville and Woodbury (they are at different elevations). I am still trying to decide if I like it.
![]() |
| The "new" Woodbury |
![]() |
| North Woodbury |
![]() |
| South Westville |
![]() |
| Westville |
Thursday, January 17, 2019
Friends and Progress
A couple of my operations group friends have stopped by to help in the rebuild.
A couple of gag photos for Gene since he is known as the Reach Police on one of the forums for
always counseling layout builders to minimize the layout width to be able to easily
collect the derailed trains. We built an access hatch in the loop especially
for him.
Later Bob came by to tune up some of the complicated trackwork before it gets partially buryed by a higher-level track.
Meanwhile I have
added some LED lighting under the shelving to make it easier to ID cars in the
staging yards. The shelf itself contains my collection of Lionel TT gauge
(1:120) static trains.
A recent Railwire forum thread was started on the equipment in the early days of n scale. Here is
my early “spreadsheet” of purchases beginning in 1968.
And some of the early equipment? (Ah the memories!)
![]() |
| 1968 Atlas hopper cars (224x series) |
![]() |
| First car is an Aurora (Postage Stamp Trains) box car, the rest are 1968 Atlas box cars |
The last picture shows the Atlas 1968 cars that are still used on my layout today. (I used PC cars as transition, Rapido to KD coupler, cars. (Penn Central was way beyond my modeling era.)
The PC and Vermont cars were built from Atlas box car kits. You could save 21 cents that way! ($1.29 vs. $1.50 for a RTR car)
Subscribe to:
Posts (Atom)












































