Wiring is much easier when you can tilt the module on the garage floor and not have to worry about hitting your head or squeezing between the bookshelves and the bottom of the layout. Compare this with the last wiring go 'round in my September 1, 2011 post.
Module track work is done. I now have to:
· Connect the leads
· Test that everything runs
· Paint (spray) the track roof brown
· Ballast the track
· Put the legs on
· Raise the original 3 modules 6"
· Sell off the 4'x8'
· Move the Woodbury modules up to the loft.
We are going to be here a while!
No comments:
Post a Comment