Sunday, September 16, 2012

Woodbury - South - Part 1

Continued some slow progress on the South Woodbury module. The other modules have had box benchwork (16"x6'). This module required the ability to fade out the Deepwater/DuPont branch and possibly duck it under the mainlines to staging so I went back to L-girder construction with a cookie cutter top (22"x6'). I should have some track laid in about a week. Then we deal with the congestion issue.


No comments:

Post a Comment