Woodbury - South - Part 1
Continued some slow progress on the
South Woodbury module. The other modules have had box benchwork (16"x6').
This module required the ability to fade out the Deepwater/DuPont branch and
possibly duck it under the mainlines to staging so I went back to L-girder construction
with a cookie cutter top (22"x6'). I should have some track laid in about
a week. Then we deal with the congestion issue.
No comments:
Post a Comment