Also
got to visit a friend who has recently switched from HO to N scale. How I would
love to have his 12'x26' finished basement room. He will be doing NS in
Virginia (oh, how I miss having mountains).
Spent
time cutting and painting plywood. All the ground level plywood is in and
attached to the bench-work. Now I am trying finalize switch locations to
service the Camden Pavonia yard. Since I have difficulty visualizing the 3D
effect of plans, I pulled out tons of stored buildings to do some mock-ups of downtown Camden (this section will be non-protypical). I just wanted
to see how things would look and fit into the overall room scenery.
Now
back to track-work (don't even mention that dirty word (ballasting)).
No comments:
Post a Comment