Saturday, December 7, 2013

30th Street Progress

The 30th street stone arch bridge section is done and with some shrubbery does a great job of hiding the 3 rear tracks over the desk.

The prototype:

The attempt:

I began the mock-up of the 30th street station area (it will be smaller so it may have to become the 29th street station, 28,..27,..). I have ME bridges to try to duplicate the high line in the back.

The Prototype:


The Mock-up:

No comments:

Post a Comment