Saturday, June 28, 2014

For the 100th Post: The First Operations Session - Hooray!

I had a 5 hour window of availability with my new crew/"posse". Since this was our first session together, I took them on a tour of the prototype area I modeled in Westville and Woodbury.  This gave them a feel for what we are trying to accomplish.

We then watched segments of a DVD showing PRR & RDG steam going through the area modeled and a David Popp video on car cards & waybills.

After pigging out on pizza we hit the train room with only 2 hours left.

The only PRSL freight schedule I have is a 1974 version (the trackage is 1950 accurate) and we attempted to run 4 of the 5 scheduled freights in the time we had available.

Skipping the morning and evening commuter runs we planned to run the following:
  1. Philly transfer into Pavonia (took longer than expected to break it down)
  2. WY843/842            Deepwater coal drag 
  3. WY33/34                Millville local
  4. WY841/840            Deepwater local
  5. WY79/80                Tank train sweeper for Texaco (Westville) and Sunoco (Paulsboro (off-line)).
  6. Pavonia to Philly transfer

We got halfway through.


The yard had electrical continuity issues (in spite of running perfectly the night before  :-)) but the yard crew persevered.






Even though south Woodbury did not have a separate switcher on the prototype , I think it will need one on my layout.



I think we have proven that the layout can keep 4 people very busy and is relatively balanced if we can keep the main yard working efficiently..

In the end:
  • We had fun
  • There is still a lot of planning that needs to be done to clean up the bottle necks.
  • In the fall we will have another go at it.



1 comment:

  1. Well, you had Tim running stuff, that'll make things not work, :). Anyways, looks like everyone had a good time and congrats on your first operating session!

    ReplyDelete