Saturday, August 18, 2018

Rebuilding

As the July 30th blog entry indicated, I tore apart the layout and decided to rearrange some portions of it in the hopes of adding staging. All the rolling stock was moved to the undisturbed Camden Pavonia Yard. Fortunately it holds over 125 cars by itself.

Three of the four end sections were removed, The right leg (Westville) was moved to the left middle. The previous middle (Woodbury) is now the right middle. Nine track staging (for both ends) is planned to now occupy the vacated right wall.





I have started connecting the Westville leg with the undisturbed Philly-Manayunk section.


Ten layout legs have been shortened (8 more to go). Looks like I’ll need:
  • Another sheet of plywood
  • (8) 2x3s, 
  • (4) 1x3s, 
  • and another 10 turnouts
Whose idea was this anyway?  😕

1 comment:

  1. I hope this works out well for you Rick. Personally, I would not be without staging as it opens up so many operating possibilities.
    Regards,
    Ron

    ReplyDelete