The 4 track north end staging held 4 trains.
- The Coal drag with 30+ loaded hoppers.
- The Sand Hog with empty gondolas and covered hoppers. (15-20 cars)
- The Tank Sweeper (20-25 tankers)
- The Philadelphia transfer run (10-20) which contains inbound loads and needed empty cars for the days industry requests.
The south end yard contains:
- Loaded gons for the Sand Hog
- Empty hoppers for the coal drag
- A new Salem local that will run between south end staging and Woodbury and back to staging.
- Storage for all cars delivered to the branches at Millville, Deepwater, and Salem.
It will always have 2 tracks open for an arriving freight and the run around track. When the departing "Turn" leaves it then again contains 2 open tracks.
No comments:
Post a Comment