[When done you go back and re-do numbers 4-6 and 8-11 :-) ].
Since Woodbury is up to phase 12, I guess it is time for a photo progress report.
Scenery
Phases
1.
Build
benchwork2. Paint wooden platform surface
3. Track - lay & paint
4. Roads - install & paint
5. Sculptamold hills
6. Basic Ground cover
7. Sidewalks - install & paint
8. Trees
9. Secondary ground cover; bushes, weeds
10. People & station details
11. Special scenes
12. Custom buildings which accurately reflect the area
I need:
Woodbury:
stationWestville: brick station
Westville: Buzby Bros. (now that I have found a picture)
Woodbury: St. Pat's Gothic church
Walnut Lane bridge
Since my eyesight ain't what it used to be, I'll probably need to find someone to do the custom buildings. Since I'm unemployed, I will have to find someone to do them and accept payment in N scale freight cars. This could be tough. :-)
I'll leave most of the pictures smaller since you
can click on them to make them larger.
Merry Christmas and Happy New Year everyone!
Woodbury Station on Cooper St
A Presbyterian type church is standing in for St. Pat's
Cooper St.
Parking lot chain link fence will eventually be reduced to half that height.
E Barber Ave and Red Oak tower
South Woodbury yard
More traffic than S Barber Ave ever saw!
Woodbury Bottling Co (been gone a while!)
A freight train coming off the Penns Grove branch
(The Woodbury yard once had an icing facility.)
Rick, have you thought of cardstock buildings as a quick, cheaper alternative? I've seen a few on layouts around here and they are very nice.
ReplyDelete